By Jason Polonski, REALTOR® with Right at Home Realty · Last updated: November 2026 · Client reviews
Can you sell a house with open or missing permits in Ottawa? Yes. Selling a house with open permits or unpermitted work is possible, but it often surfaces late, when the buyer’s lawyer checks City records, and that is the worst time to discover it. Sellers who pull their own permit history before listing can close old permits, legalize work or disclose it and price for it on their own schedule.
Permit problems are more common than most owners realize. A contractor finished a basement and never booked the final inspection. A previous owner built a deck, moved a wall or added a bathroom without a permit. A basement apartment has been rented for years but was never approved as a legal unit. None of these issues necessarily make a home unsafe, but each one can delay a closing, shake a buyer’s confidence or affect their financing and insurance.
This guide explains the difference between open permits, unpermitted work and outstanding orders, how to check your property’s records in Ottawa, the options for fixing each one, and how to disclose and price what remains. It belongs with the guide to selling an older home in Ottawa, although permit issues turn up in homes of every age. To talk through your situation, call or text Jason Polonski at (613) 601-9333.
Key takeaways
Buyers, lawyers and the City treat these three situations differently, so it helps to know which one you are dealing with.
An open permit is a building permit that was issued but never closed with a final inspection. The work may be finished and perfectly sound, but the City’s file still shows it as incomplete. Open permits are common after renovations where the homeowner or contractor simply forgot to book the last inspection.
Unpermitted work is construction that needed a permit but never had one. Common examples in Ottawa include finished basements with new bedrooms or bathrooms, basement apartments, decks above a certain height, additions, removed or altered load-bearing walls, garage conversions and relocated plumbing. Under Ontario’s Building Code Act, construction that requires a permit is not supposed to start without one. The City’s building permit guidance explains which projects need one.
Electrical work is regulated separately. In Ontario, almost all electrical work requires a notification filed with the Electrical Safety Authority, and a building permit does not replace it. A finished basement can therefore have a closed building permit and still have uninspected wiring.
Orders are formal notices issued by the City under the building code, zoning by-law or property standards by-law. An unresolved order is a more serious problem than an open permit because it represents an identified violation, and buyers’ lawyers treat it accordingly.
Permit issues rarely appear at the showing. They appear when professionals start checking records, which is usually after an offer has been accepted.
As part of their title search and requisitions, many buyers’ lawyers request a report from the City on the property’s permit and compliance status. Under the City’s compliance reports by-law, that report can include issued building permits, the status of final inspections and any outstanding orders. If it shows an open permit or an order, the lawyer sends a requisition asking the seller to fix it before closing. Requisitions arrive close to the closing date, which leaves little time to schedule inspections.
Inspectors notice signs of work done without permits: a basement bedroom without a proper egress window, a bathroom with unusual venting, a deck with undersized framing or a wall that used to be load-bearing. They cannot confirm permits themselves, but they can recommend that the buyer check.
A lender may hesitate if the value relies on space or rental income that is not legally recognized, such as an unapproved basement apartment. Insurers may ask about renovations, and work that was never inspected can complicate coverage.
An open permit that could have been closed with one inspection becomes a negotiation once it appears in a requisition. A buyer who discovers unpermitted work after firming up may ask for a holdback, a price reduction or a delayed closing. Finding these issues before you list keeps you in control.
You can find out most of what a buyer’s lawyer will see before you list. The City offers two useful services.
The City’s compliance summary report provides information on issued building permits, the status of occupancy permits and final inspections, and any outstanding orders or complaints under the building code, zoning by-law or property standards by-law. The City notes that these reports are typically requested because of a possible sale or refinancing, which is exactly the situation you are in. The services and fees are set out in the City’s compliance reports by-law.
As the current owner, you can also request copies of permit applications, permits, plans, inspection reports and occupancy permits through the City’s Access to Building Permit Records program. These documents show what was approved and inspected, which is useful when the work was done before you bought the house.
Gather contractor invoices, permit cards, inspection stickers, ESA Certificates of Acceptance and anything your own purchase lawyer received when you bought the home. Then compare what was done to the house with what the records show. Any gap is a question a buyer may ask.
Requesting records takes time, and so does booking inspections or preparing drawings. Starting several weeks before listing gives you room to act. It also lets your agent describe the home accurately, including whether a basement unit is legal, a detail that matters to buyers looking at rental income.
The right fix depends on what the records show and how much time you have before you sell.
If the work was completed as approved, closing an open permit may only require booking the final inspection. If the inspector needs to see something now covered by drywall, or if the work differs from the approved plans, expect a little more effort: revised drawings, a small amount of opening up, or an engineer’s letter. Once the permit is closed, keep the record with your listing documents.
Work done without a permit can often be brought into compliance by applying for a permit after the fact. That usually means preparing drawings of what was built, and the inspector may need to see framing, plumbing or insulation to confirm it meets the building code. Depending on the project, some drywall may have to come off. Electrical work requires its own path through the Electrical Safety Authority with a Licensed Electrical Contractor.
For basement apartments in particular, legalizing the unit can add significant value for buyers who want rental income, but it involves requirements for things like fire separation, exits and ceiling heights. The guides to secondary dwelling units in Ottawa and adding a basement apartment explain what is involved.
Occasionally, the simplest fix is to remove the work, for example a second kitchen in a basement that was never approved. That avoids misrepresenting a unit that is not legal, but it also removes a feature some buyers value. Talk it through before taking anything out.
If time is short or legalizing would be impractical, disclose the work, provide what records you have and price the home on the basis that the buyer is taking on the issue. That is covered in more detail below.
| Issue | Typical fix | Time to plan for |
|---|---|---|
| Open permit, work done as approved | Book the final inspection | Short, depending on inspection availability |
| Open permit, work changed from plans | Revised drawings, then inspection | Longer; may need some opening up |
| Work done without a permit | Apply for a permit for existing work, with drawings | Weeks or more; plan before listing |
| Electrical work without ESA notification | Licensed Electrical Contractor files and arranges inspection | Depends on access to wiring |
| Outstanding City order | Resolve the order with the City | Varies; involve your lawyer early |
Permit issues sit at the intersection of real estate and law, so this is an area to involve your real estate lawyer early, ideally before you sign a listing agreement. Your lawyer can tell you how the issue is likely to appear in the buyer’s requisitions and how to respond. If you need one, the Law Society of Ontario offers a referral service, and the guide to choosing an Ottawa real estate lawyer explains what to look for.
Describe the home as it legally exists. If a basement suite is not a legal unit, do not market it as one. If a basement bedroom lacks a proper egress window, do not count it as a bedroom without explanation. Misdescribing space is one of the fastest ways to turn a permit question into a legal dispute.
If you know about unpermitted work, answer questions about it truthfully and provide the documents you have. Ontario’s regulator, RECO, publishes guidance on seller responsibilities, and the guide to what to disclose when selling a home in Ottawa explains how disclosure works in practice.
Buyers often have title insurance, and some policies cover certain losses related to permits or work orders. Coverage varies, and many buyers and lawyers still prefer the issue resolved before closing. Do not assume title insurance will make a permit question disappear.
Pricing depends on what the issue is and whether it is resolved. A closed permit and documented work have no price effect at all. A disclosed open permit with a clear plan to close it usually has a small one. Significant unpermitted work, especially a basement apartment or structural changes, can affect value meaningfully, because a buyer is taking on cost, time and uncertainty.
When you price, compare the home with similar properties based on its legal status, not its current use. A finished basement that cannot be documented may still add living space a buyer values, but a rental suite that is not legal should not be valued as income. A thorough home value assessment should make those distinctions clear.
Share the City report, your documents and your plan with serious buyers’ agents early, preferably before offers. When the information is on the table from the start, buyers price it into their offer instead of using it to renegotiate after the inspection.
If you are weighing whether to finish, legalize or simply price for work, the guide to whether to renovate before selling helps frame the decision.
Jason Polonski is a full-time REALTOR® with Right at Home Realty who has worked in Ottawa real estate for more than 15 years, helping hundreds of buyers and sellers across Kanata, Nepean, Barrhaven, Stittsville and the rest of the city. Before real estate, he worked in the construction and electrical trades and holds a technical diploma in construction electricity, so he recognizes renovation work that is likely to raise permit questions and helps sellers check records, close permits or plan disclosure before the house is listed, not days before closing. He also earned a Bachelor of Commerce from Concordia University with a double major in Marketing and Finance, which shapes how he weighs the cost of legalizing work against its effect on price. His 1% Listing Commission leaves more of the sale with you. Call or text Jason at (613) 601-9333, or read his Google reviews.
For the full selling process, see the guide to selling your house in Ottawa.
Yes. An open permit does not stop a sale, but the buyer’s lawyer will often ask for it to be closed before closing. Booking the final inspection before listing is usually the simplest way to avoid a last-minute delay.
Request a compliance summary report from the City of Ottawa. It shows issued building permits, the status of final inspections and any outstanding orders. As the owner, you can also request copies of permits, plans and inspection reports through the City’s building permit records program.
If you knew about unpermitted work and did not answer questions about it honestly, the buyer may have a claim after closing. If you know about it before you list, disclose it, provide your documents and speak with a real estate lawyer about how to handle it.
Often, yes. The City may accept an application for work already completed, usually with drawings, and the inspector may need to see parts of the construction to confirm it meets the building code. Some opening of finishes may be required.
Some title insurance policies cover certain losses related to permits or work orders, but coverage varies. Many buyers and lawyers still want the issue resolved before closing, so do not rely on title insurance as your plan.
Only if it was approved as a secondary dwelling unit with the required permits and inspections. Rental use alone does not make it legal. Check the City’s records before describing the space as a legal unit in your listing.
Yes. Electrical work in Ontario requires a notification filed with the Electrical Safety Authority, separate from a building permit. A Licensed Electrical Contractor can help bring uninspected work into compliance.